(September 08, 2008) Two 30 foot tall gateway elements are being installed in the median of the bridge to mark the crossing of the Mississippi River
Larger image
(September 03, 2008) Pouring concrete for the observation plazas surrounding the base of the piers
Larger image
(September 03, 2008) Constructing the concrete barriers
Larger image
(August 20, 2008) The Pier extensions protect the bridge bearings and add to the aesthetic appeal of the structure.
Larger image
(August 20, 2008) "Snowbound" colored coating is being applied to all concrete surfaces.
Larger image
(August 20, 2008) Aerial view of the bridge as finishing work progresses
Larger image
(August 11, 2008) Concrete being placed for the southbound lanes at Span 4 (on the north end of the bridge)
Larger image
(August 11, 2008) Signage is being installed
Larger image
(August 11, 2008) Planting and landscaping is being completed
Larger image
(August 04, 2008) Recently paved highway on the north side of the project, near University Avenue.
Larger image
(August 04, 2008) Span 4 between Abutment 5 and Second Street Southeast
Larger image
(August 04, 2008) Barrier rail installation on the main bridge
Larger image